References 2019

  • 2019 MEYERWERFT Papenburg/DE, cruise ship „Spectrum of the seas“; innox-furniture installation, welding works, interior finishing, furniture transportation, electro cable pulling.
  • 2019 MEYERWERFT Papenburg/DE, cruise ship „Norwegian Encore“; innox-furniture and handrails  installation, welding, insulation, tiling works.
  • 2019 NAVANTIA Cadiz/ES, ship „Star Pride“; tiling laying works in „dry-dock“.  
  • 2019 NEPTUN-WERFT Rostock/DE, pipe fitting, welding soldering of cooper pipes, carpet installation.
  • 2019 COLUMBUS CRUISE CENTER Bremerhaven/DE, panel installation in ship refrigerator.
  • 2019 KLEVEN Ulstenvik/NO, interior finishing in the ship „Maersk Maker“.
  • 2019 COLOR LINE FERRY TERMINAL Oslo/NO, interior finishing in swimming ship „Color Fantasy“.
  • 2019 MEYER Turku/FI, tiling laying in cruise ship „Costa Smeralda“.
  • 2019 PELLA SIETAS Hamburg/DE, installation of hanging ceiling.
  • 2019 AMELS Vlissingen/NL, interior finishing in repair of mega yacht „Megona“, „Ilona“.
  • 2019 BLOHM & VOSS Hamburg/DE, furniture upholstery in ship repair.
  • 2019 ASSENS SHIPYARD Assens/DE, insulation, tinsmithing. 
  • 2019 NAVANTIA Cadiz/ES, welding, painting, furniture assembling, tiling lying in „dry-dock“ of the cruise ship „Carnival Triumph“.
Marino projects
S. Nėries st. 6

Klaipėda, Lithuania

Ph: + 370 612 10955
E-mail: info@marinoprojects.com

Certificates